Structural Rebuild covers load-bearing repair through final inspection, coordinated with your Folly Beach building department at every stage.
📞 Call +1-866-484-1409 Now
One licensed team accountable for the whole scope.
Inspections built into the schedule, not an afterthought.
Change orders require your written approval.
A defined timeline with milestones, not open-ended.

Inspected before any finish work covers it up.
Fire-damaged trusses replaced with engineered lumber matched to span.
All required permits filed with your local Folly Beach building department.
Installed to code once framing passes inspection.
Where a rebuild starts looking like a home again.
Certificate of occupancy coordinated with Folly Beach inspectors.
A technician answers and lines up a structural evaluation.
A project lead arrives to evaluate structural scope in person.
You approve the plan and permits before construction.
Nothing closes out until final inspection passes.
"The framing repair passed inspection on the first try, which our contractor friend said doesn't always happen." — Homeowner, Folly Beach
"Not dealing with the permitting office directly saved us a lot of stress." — Homeowner, Folly Beach, SC
"The project stayed on the schedule they gave us at the start, which surprised us given the scope." — Homeowner, Folly Beach
Included as part of the standard scope.
Most projects run six to twelve weeks from permit to final inspection.
Yes, full GC licensing covers the entire rebuild scope.
Significant damage typically gets engineer review first.
We provide the paperwork adjusters need.
We keep Folly Beach rebuild projects on schedule by managing permitting directly.
